Customization: | Available |
---|---|
After-sales Service: | Install Video Support |
Material: | Sandwich Panel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main material: high-strength galvanized steel+color steel composite plate structure: use light steel materials such as galvanized square pipes and galvanized angle iron to make the frame, and color steel composite plate combination to make the wall panel. Part of the frames are connected by hinges to achieve free opening and closing
Appearance: The house can be opened and closed, and can be used when opened. The living space is spacious and easy to move
Performance: Excellent wind and earthquake resistance, simple and convenient installation and completion
Prefabricated houses are a new type of building structural system. Its framework consists of a galvanized steel foundation and pillars, and the beams are galvanized square tubes. Both the wall and roof are made of PU/EPS/rock wool/glass wool sandwich panels, which have excellent insulation performance. This house needs to be assembled on site. Each bolted structural component is convenient and fast. Prefabricated houses are widely used in family residences, warehouses, workshops, offices, etc.
basic feature |
Dimensions
|
5900*6320*2480 |
Internal dimensions | 5560L*6160W*2240H* | |
folding state | 5900*2200*2480 | |
wallboard |
main body
|
75EPS board |
Side top plate | 50EPS board | |
Internal partition | 50mm EPS board | |
wall | material quality | Galvanized steel+insulation board |
roof | material quality | Galvanized steel+insulation board |
Easy to make, aesthetically pleasing, sturdy, with few welding parts.
On site installation: No floor required, easy to disassemble by 2-3 people, installation only takes 20-30 minutes, and it opens as a whole. Fire protection level 1, earthquake resistant, wind proof, rain proof, foldable, recyclable, and in compliance with emergency living standards