After-sales Service: | Support Video Installation |
---|---|
Warranty: | One Year Warranty |
Material: | Sandwich Panel |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Model NO. | flat pack house | Frame Structure | Galvanized Steel Structure |
Door | High-Quality Steel Door | Window | Plastic Steel Sash Window |
Color | White,Blue,Green,Brown, or Customized | Weight | 1.0 T |
Transport and Load | Container Shipment | Integral Frame Coating | Electrostatic Spray |
Design Style | Modern or Customized | Field of Application | Office, Accommodation, Dining Room |
Floor | Fireproof Glass Magnesium Floor | Type | Folding House, Prefabricated Modular Houses |
Fireproof Performance | a Level | Transport Package | Sandwich Box Pack |
Origin | Hebei, China | Production Capacity | 5000 |
External Dimension |
5990*2990*2840mm | ||||||
Heat- InsulatingProperty |
£=0.043W/m.K | Wind-Resistant Performance | 0.50KN/m2 | ||||
Sound Insulation Performance | Volume isolation≥30dB | Fireproof Performance | A Level | ||||
Sound Insulation Performance | Level 2 | Seismic Performance | 8 Level | ||||
Surface Live Load | 2.0KN/m2 | Roof Live Load | 0.50KN/m2 | ||||
Structural Surface | Electrostatic Spraying White | Connection Type | High strength bolted connection | ||||
Number | Name | Details | unit | number | notes | ||
1 | framework | Top Frame | 2.0mm galvanized formedcrossbeam with a zinccontent of80g/m2160mm5670mminlength | Support | 2.0 | galvanized | |
2.0mm galvanized formedcrossbeam with a zinccontent of80g/m2160mm2670mmin | Support | 2.0 | galvanized | ||||
Q235 qalvanizedrectangular pipe 60mm*40mm | Support | 7.0 | galvanized | ||||
Q235 qalvanizedrectangular pipe 20mm *20mm | Support | 2.0 | galvanized | ||||
Bottomframe | 2.0mm galvanized formedcrossbeam with a zinccontent of80g/m160mm5670mm inlength | Support | 2.0 | galvanized | |||
2.0mm galvanized formedcrossbeam with a zinccontent of80g/m160mm2670mm inlength | Support | 2.0 | galvanized | ||||
Q235 qalvanized rectangular pipe 80mm 40mm cross brace | Support | 9.0 | galvanized | ||||
Steel column | 2.0mm galvanized steel column with a zinc content of 80g/m2,160mm*160mm*2480mm high | Support | 4.0 | galvanized | |||
8mm connector L-shaped column reinforcement | piece | 8.0 | Welding and polishing | ||||
Column wrap angle2480mm | root | 4.0 | |||||
Hanging head | Galvanization content of 8.0mm upper cornerparts80g/m2160mm=160mm2480mm high | individual | 8.0 | ||||
colour | Electrostatic spraying ofoutdoor specializedcoatings,baking process | cover | 1.0 | Paintbakingprocess | |||
2 | Roof | Roof tiles | 0.3mm color steel singletile,360 degree bite,special waterproof method | cover | 1.0 | ||
Insulation materials | 50mm qlass wool insulationcotton quilt | cover | 1.0 | ||||
dampproof course | Damp proof film,PE resinfilm 1.0mm | cover | 1.0 | ||||
Strip suspended ceiling | 831 color steel integratedceiling panel,0.25mm thick | cover | 1.0 | ||||
3 | ground | floor | 15mm Glass maqnesiumPlate | piece | 5.0 | ||
skirting line | cover | 1.0 | |||||
Floor leather | 1.0mm wear-resistant floorleather | cover | 1.0 | ||||
4 | Wall panel | New type of rock wool composite board |
50*950mm double-sided0.25mm 50kg/m3 rockwool board,double-sidedorange peel pattern,singlesided film covering | cover | 1.0 | ||
5 | door | High quality anti-theft door |
970mm*1970mm | dooror windowframe |
1.0 | ||
6 | window | Plastic steel windows/customizable |
door or window frame |
1.0 | |||
7 |
electricalsystem |
Distribution box | Concealed distribution box | cover | 1.0 | nationalstandard | |
Industrial plug and socket | 220V 50HZ3P32A | cover | 1.0 | nationalstandard | |||
lamp | Led dustproof lamp, 36W | units | 2.0 | nationalstandard | |||
socket | 10A five hole socket* | individual | 2.0 | nationalstandard | |||
16A three hole socket* | individual | 1.0 | nationalstandard | ||||
lamp switch |
single switch | individual | 1.0 | nationalstandard | |||
Note: 1. The water and electricity system (including 220V strong electricity only) only covers the indoor part, and Party A shall provide the outdoor access power; 2. No air conditioning. 2. Single box main inlet wire 6 square copper wire, indoor air conditioning socket wire specification 4.0 square copper wire, ordinary socket wire specification 2.5 square copper wire, lighting 1.5 square copper wire, indoor maximum load 7040W. |
About us -Hebei Yijia Integrated Housing Co., Ltd
We manufacture a range of prefab house products, container house related goods. Our core products include:
1 All kinds of prefab house for hotel .office and hospital,
2 all kinds of Folding Container House
3 Flat Pack Container House
4 space capsule house
5 expandable container house, etc
Our experienced team of professionals
1.Our company is a comprehensive trading company integrating design, production and sales, with its own factories .
2.The company currently has three branches and more than 30 warehouses nationwide. The company has independent production facilities such as molding workshops, welding workshops, cutting production workshops, and final assembly workshops.
3.It has also established a specialized housing modular research institute, a light steel housing business unit, and a modular housing business unit, gradually establishing a sales service center centered in Hebei and supporting the country.You'll also find our prices are competitive.
1.The products developed by the enterprise are widely used for temporary housing in construction, railways, highways, bridges, water conservancy engineering, electricity, petroleum, tourism, and epidemic prevention and control units.
2.We have established long-term and stable cooperative relationships with multiple excellent enterprises such as MCC, Huaxi Group, Huaxi Energy, China Power Construction, BUCG, Guangxi Construction Engineering, State Grid, China Railway Construction, and China Railway Group.
FAQ
A: This depends on the order quantity. Generally speaking, the delivery time will be within 15 to 30 days.
3. How to ship?
A: Ocean container loading
4.How to install it?
A: We will provide you with installation instructions and videos, and if necessary, we will send technical personnel to assist you. However, visa fees, airfare, accommodation, and wages will be provided by the buyer.
5. How do you ensure the quality of the product?
A: Strict product quality control enables quality to achieve the future. This is the purpose of our factory. Every product in our factory has strict testing procedures and must achieve 100% quality before delivery.
6. Is it difficult to assemble the room?
A: Not at all. As long as you can use electric tools, you can build a house independently according to the construction drawings
7. How to pay?
Answer: Information exchange and letter of credit are acceptable and will receive more appreciation. 30% deposit before production and 70% balance before installation
Suppliers with verified business licenses