Customization: | Available |
---|---|
After-sales Service: | Support Video Installation |
Name: | Mobile Integrated House |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description
product name:
Container activity room |
product name: Galvanized steel+rock wool sandwich panel |
Product size:
On demand customization
|
Usage duration: 20-30 years |
Product features: firm/fast/flexible/ |
Product temperature resistance: -50 ° C-50 ° C |
Usage scenario:Shopping plazas, communities, schools, enterprises, factories, etc |
Detailed Photos
1. Steel structure design, easy to disassemble everywhere, easy to install, and long service life,,
extermal size
|
5800*L2480*W2500*H
|
|||
dampproof course
|
Damp proof film+PE resin film 1.0mm
|
|||
Steel structure
|
100% steel frame material
|
|||
Wall panel
|
New type of rock wool composite board 50 * 950mm+single-sided film covering
|
|||
Wall color
|
Custom Colors
|
|||
Roof
|
50mm EPS sandwich panel /rock wool sandwich panel
|
|||
Door
|
Optional doors
|
|||
Window
|
Aluminium alloy sliding window
|
|||
Floor
|
18mm glass magnesium plate 1175 * 2820mm
|
|||
lamp
|
LED dustproof light, 36W
|
|||
Floor load
|
250kg/sqm
|
|||
Electricity
|
Optional standard
|
|||
Wind rasistance
|
Grade 11 wind, wind speed≤120km/h
|
|||
Earthquake resistance
|
Grade 8
|
Certific ations
Lnstallation Lnstructions
1. Preparation before installation:
-Determine if the installation position meets the requirements, such as floor flatness, load-bearing capacity, etc.
-Prepare the necessary tools and equipment, such as wrenches, screwdrivers, cranes, etc.
-Ensure that safety measures have been implemented, such as wearing safety helmets, gloves, etc.
2. Installation steps:
-Transport the finished packaging box to the installation location and hoist it with a crane or other appropriate equipment
Company Profile
Application Scenario
Yijia Company has established long-term and stable cooperative relationships with multiple outstanding enterprises such as MCC, West China Group, West China Energy, China Power Construction, BUCG, Guangxi Construction Engineering, State Grid, China Railway Construction, and China Railway Group
1, Service objectives and principles:
1. Service objective: To provide high-quality, thoughtful and meticulous after-sales service to meet the needs of customers.
2. Service principles: rapid response, patient answers, timely problem-solving, and continuous improvement. 2, Service content and form: 1 Service content:
-Provide corresponding maintenance and improvement plans for various problems in housing engineering, such as water leakage, cracking, equipment failures, etc.
FAQ
A: This depends on the order quantity. Generally speaking, the delivery time will be within 15 to 30 days.
3. How to ship?
A: Ocean container loading
4.How to install it?
A: We will provide you with installation instructions and videos, and if necessary, we will send technical personnel to assist you. However, visa fees, airfare, accommodation, and wages will be provided by the buyer.
5. How do you ensure the quality of the product?
A: Strict product quality control enables quality to achieve the future. This is the purpose of our factory. Every product in our factory has strict testing procedures and must achieve 100% quality before delivery.
6. Is it difficult to assemble the room?
A: Not at all. As long as you can use electric tools, you can build a house independently according to the construction drawings